|
Higher Education Projects
|
Grupe Conference Center
Interior architecture services for this small, 100 seat campus conference center included a
remodeled kitchen and restrooms, new furnishings, lighting and finishes. The project included
redesign of interior elements to fit with the 1950's style conference center. |
|
Hutchinson Hall The scope of work included design for a new exterior exit stair,
refinishing of the gymnasium floor, and renovation of the inteiror studios and offices. The renovation
work was done after-hours to avoid hindering use of the spaces by the
UW Drama School during the day. |
|
Penthouse Theatre The initial work included the selection of a moving method and route,
plans for disassembly and reassembly, programming with the School of Drama, site design and cost
estimates. New elements for the historic theatre included a new 7,000 s. ft. basement addition,
interior restoration, a rear terrace and forecourt, and perimeter landscaping. |
|
UW Architecture Hall Special care was taken to integrate new mechanical, electrical, and
rated exiting corridor systems with the building's historic character. The design for the
architectural educational facility provides a clear distinction between the original historic
walls and new enclosures as a physical lesson for students. |
|
Steam Plant Addition The scope of the project included design of the building exterior,
material selections, cost estimation and presentations to the University Architectural Commission. The design incorporates a simple, bold, industrial steel frame
facade in an effort to recognize the functional quality of the boiler piping and venting within the building. |
|
|
|
|
|